Energy solutions tailored to buildings

We look at your building as a whole.

FM-DD E-Shield coordinates infrared heating, insulating coatings and plaster, and a comprehensive EMF shielding concept. Where appropriate, we also consider solar power and water supply as part of a plan for greater self-sufficiency.

Request an expert consultation

Wekerle Plusz – renovation guide

Homes and commercial buildings – projects in Hungary and abroad

Designed around the whole building

A system tailored to your building

The right combination depends on the building's condition, its use and the site. Each component can be assessed separately or integrated into a broader system.

01 / HŐKOMFORT

Intelligent infrared heating

Heating film solutions matched to how each room is used and to the building's thermal characteristics.

02 / ÉPÜLETFIZIKA

Insulating coating and plaster

A layered finish based on the building fabric and interior surfaces to address thermal comfort and moisture.

03 / ÁRNYÉKOLÁS

Comprehensive EMF solutions

Site-specific electromagnetic shielding with appropriate connections and grounding. Results can be checked through instrument measurements.

Options for self-sufficiency

Energy and water in one plan.

Depending on the building and site, we can assess solar panels, energy storage, drilled or dug wells and water treatment. These elements can form a coordinated plan for greater self-sufficiency.

Suitability, required permits, water quality and implementation costs must be assessed for each project.

NAPENERGIA Generation and storage
VÍZNYERÉS Drilled or dug well
VÍZKEZELÉS Treatment tailored to demand
Individual planning

From assessment to implementation

We prepare an offer once technical needs and feasibility are clear. Expert assessment and preparation of an offer may involve a fee; we agree the terms in advance.

01

Initial discussion

We review the building, your goals and any existing plans.

02

Technical assessment

We identify suitable solutions based on the building's characteristics.

03

Tailored offer

You can decide based on a clear technical scope and a project-specific cost estimate.

FMDD E-Shield Kft. · Renovation knowledge hub

Successful renovation starts with sound decisions.

Prepare for the Wekerle Plusz energy renovation opportunities. Step by step, we help you understand your property's condition, the documents required and how to prepare for implementation.

Content last reviewed: 5 November 2026 · Preparation guide

The announced framework at a glance Official programme announcement [1]

Summary of the government programme website – 5 November 2026
ItemHouse renovation strandCondominium and panel-building strand
Announced launchFebruary 2027March 2027
LoanUp to HUF 15 million; 15 years; fixed 3% per yearPanel buildings: up to HUF 4 million; brick buildings: HUF 5 million per dwelling; 15–20 years; 0%
Announced own contribution5% in addition to the loan, capped at HUF 500,000HUF 200,000 per dwelling
Grant bandD–G: 30%; H–I: 50%; A–C: loan onlyD–G: 30%; H–I: 50%; A–C: outside this strand
Required resultAt least 30% energy savings; certificates before and after renovation and costs documented by invoices

According to the announcement, the grant is deducted from the loan principal as an early repayment. The precise classification of buildings with few dwellings, calculation method, product requirements and permitted start date must be clarified in the detailed rules. Open the official programme website

For private owners

Detached, terraced and semi-detached houses

Understand your building before choosing a renovation package.

  1. Review property details and ownership
  2. Organise existing documents and consumption records
  3. Survey the building on site and identify the experts needed
  4. Assess the initial energy performance and renovation options
  5. Prepare a full budget and discuss financing
  6. Check final programme rules and conditions for starting work
  7. Contract, carry out work and document progress
  8. Complete technical handover, energy verification and financial settlement
Houseowner's checklist

For condominium representatives

Condominiums and housing cooperatives

Support the technical proposal with a transparent collective decision.

  1. Organise representation and condominium documents
  2. Review the building's condition and financial position
  3. Obtain authority for preparation and expert assignments
  4. Develop building-wide energy options and a cost plan
  5. Inform owners about financial obligations and effects on use
  6. Decide on investment and financing under the final rules
  7. Manage contracts, inspections and resident communications
  8. Complete handover, settlement and communal record keeping
Condominium checklist

The complete guide – twelve chapters

Expand the chapter you need. Each section ends with a practical next step.

01. What do we know about Wekerle Plusz?

The first step in renovation is becoming informed. The framework below summarises the government programme website as reviewed on 5 November 2026; individual eligibility depends on the final call and the lender's assessment.

  • Distinguish the programme announcement from the requirements for an actual application.
  • Record the property type and proposed work.
  • Do not automatically apply the grant percentage to the full investment cost.

Your next step: Read the framework summary, then choose the appropriate owner pathway.

02. Which pathway may suit the property?

The property's registered classification, number of dwellings, ownership structure and heating arrangement matter alongside its everyday description. The classification of a semi-detached house or multi-dwelling building should therefore be clarified individually.

  • For a house, record the owners, heated floor area and use.
  • For a condominium, establish whether work concerns common property or an individual dwelling.
  • Seek individual advice for undivided co-ownership, mixed use or protected buildings.

Your next step: Complete the property information sheet. Mark uncertain information as unknown.

03. What can we prepare now?

Start by collecting documents you already have. This is FMDD's preparation list, not an official list of application annexes. Order new paid documents once the required content and issue date are known.

  • Collect floor plans, earlier drawings and energy documents.
  • Find invoices for earlier renovation work and equipment datasheets.
  • Arrange preferably 12–24 months of consumption records chronologically.
  • Take dated photographs of the building and observed defects.

Your next step: Make a document register: available, missing, to be obtained.

04. Energy performance certificate: the starting point

The energy performance certificate shows the calculated energy performance of a building or independently usable unit. It does not replace a technical defect survey. Energy bills also reflect actual use and therefore differ from the calculated energy demand stated in the certificate. [2]

  • Check the assessor's authorisation in the relevant chamber register.
  • Provide available plans and known construction details.
  • Request the official certificate and supporting calculations.
  • Check separately whether an existing certificate is acceptable for the programme; general validity alone is not enough.

Your next step: Agree with the assessor how to document the initial condition before starting the planned work.

05. Building renovation passport and modernisation plan

The certificate rates a particular condition; a building renovation passport sets out a staged route to modernisation. Under the EU framework, use of the passport is voluntary unless a Member State makes it mandatory. The Hungarian procedure and any programme obligation must be checked against the applicable national rules. [3]

  • The plan should show how the renovation stages affect one another.
  • Assign a target result, cost and prerequisites to each stage.
  • Avoid an initial investment that may later cause unnecessary demolition or oversizing.

Your next step: Request a tailored modernisation plan; treat a document as an official passport only if issued under the applicable rules.

06. How can verifiable savings be planned?

Assess the renovation package's expected result for the building as a whole. A product's general savings claim does not replace a calculation for the particular house. Improved comfort, lower bills and the programme's energy performance result may be different measures.

  • Compare a basic option, a coordinated package and a staged option.
  • Have the expert assess the initial and planned conditions using a consistent methodology.
  • Include the precise parameters of the selected materials and equipment in the calculation.
  • Ask which technical changes could jeopardise the planned result.

Your next step: Select a package supported by calculations and record the design assumptions.

07. The right sequence of work

FMDD's recommended workflow starts with a condition survey. Water ingress, moisture, structural defects, ventilation and electrical capacity must be assessed alongside the selected renovation. Adobe and mixed masonry require particular attention to layer build-ups and moisture conditions.

  • First identify the causes of defects and the experts required.
  • Coordinate roof, facade, window, door and building-services work.
  • Size building-services equipment for the planned building condition.
  • Check any permit, local appearance and heritage protection requirements.

Your next step: Request a technical schedule showing the sequence and responsible parties.

08. Budget and financing

The full funding requirement includes preparation, construction, related work and a contingency. The own contribution stated by the programme may not cover every expense requiring private funds. The timing of financing matters as much as its amount.

  • Request itemised quotations based on the same technical scope.
  • List likely eligible costs, unresolved items and privately funded items separately.
  • Assess temporary funding needs between deposits, interim invoices and disbursements.
  • Ask about the total cost of the loan, security requirements and when the grant is credited.

Your next step: Complete the financing worksheet and clearly label any assumed grant as an assumption.

09. Preparing condominium decisions

The condominium representative connects the technical proposal with the owners' decision. Authorisation to prepare the project and the final decision on investment and borrowing can be separate decision points. Establish the required voting threshold for the particular matter, taking account of current rules and the condominium's documents. [4]

  • Organise the deed of establishment, organisational and operating rules (SZMSZ) and representation documents.
  • Present existing savings, debts and expected obligations per dwelling.
  • Provide owners with comparable technical options.
  • Define arrangements for access, communications, decision-making powers and changes.

Your next step: Prepare meeting papers covering technical, financial and authorisation matters. Apply a separate procedure for housing cooperatives.

10. Experts, quotations and contracts

The energy assessor, designer, contractor and technical inspector perform different roles. For quotations to be comparable, materials, layer build-ups, quantities, related work and handover documents must be precisely defined.

  • Check task-specific authorisations and registration details.
  • Request product performance and conformity documentation.
  • The contract should specify the price, deadline, payment schedule and change procedure.
  • Check any programme-specific prequalification separately.

Your next step: Compare quotations. Treat FMDD's acceptance under the programme as established only where its status has been verified.

11. From application to construction

Use the final call to prepare an individual list of annexes. Clarify in advance the permitted dates for starting work, contracting, deposits and invoicing. A preparation consultation is neither a grant application nor loan approval.

  • Check eligibility, annexes and deadlines.
  • Before signing a contract, establish which commitments may be made before the decision.
  • Create a project folder for contracts, photographs, invoices and payment records.
  • Agree technical changes with the relevant experts and, where necessary, the lender before implementation.

Your next step: Hold a documented project-start meeting with the responsible parties before work begins.

12. Handover, verification and record keeping

Project closure combines three checks: technical acceptance of the completed work, verification of energy performance and financial settlement. A signed handover alone does not replace a missing invoice or energy document.

  • Record defects, missing items and rectification deadlines.
  • Obtain operating, maintenance and warranty documentation.
  • Prepare the required final energy documents based on the actual completed condition.
  • Track settlement and record-retention deadlines under the final rules.

Your next step: Finalise the document register, then prepare an operation and maintenance calendar.

How can FMDD help?

Cooperation starts by understanding the property and the renovation goal. This provides the basis for agreeing a survey, involving the required experts and organising implementation. The individual agreement defines the scope, fee and responsibilities in each case.

We assess the suitability of coatings, renders, heating solutions, moisture treatment and other additions against the building's condition. Technical suitability, calculated energy performance and programme eligibility are checked separately. We do not assume automatic entitlement to funding or a general savings guarantee.

Five printable worksheets

Open a worksheet, then use its print button to print it or save it as a PDF. These are preparation worksheets, not substitutes for official application forms.

1. Houseowner's preparation checklist

FMDD E-Shield Kft. · Preparation worksheet

Houseowner's preparation checklist

Property address: ................................................................................

Date completed: ................................................................................

Contact person: ................................................................................

  • ☐ Ownership and use reviewed
  • ☐ Existing energy certificate located or its absence recorded
  • ☐ Plans and earlier renovation records collected
  • ☐ Consumption records organised
  • ☐ Moisture, cracks, water ingress and building-services defects recorded
  • ☐ Electrical capacity and planned equipment to be discussed
  • ☐ Technical survey tasks defined
  • ☐ Energy options and itemised budget prepared
  • ☐ Review of final programme rules scheduled
  • ☐ Permitted work-start and invoice dates clarified

Missing documents: ................................................................................

Next step and responsible person: ................................................................................

2. Condominium preparation checklist

FMDD E-Shield Kft. · Preparation worksheet

Condominium preparation checklist

Condominium name and address: ................................................................................

Number of dwellings: ................................................................................

Condominium representative: ................................................................................

Date: ................................................................................

  • ☐ Deed of establishment, organisational rules and representation documents available
  • ☐ Work on common and individually owned property separated
  • ☐ Earlier resolutions and renovation work reviewed
  • ☐ Reserves, arrears and outstanding loans summarised
  • ☐ Authority for surveys and requesting quotations clarified
  • ☐ Technical and energy options being prepared
  • ☐ Method for presenting costs per dwelling defined
  • ☐ Voting threshold and bank conditions checked
  • ☐ Access, resident communication and contact arrangements established
  • ☐ Annexes needed for the final decision prepared

Next owners' meeting task: ................................................................................

Responsible person and deadline: ................................................................................

3. Property information sheet

FMDD E-Shield Kft. · Preparation worksheet

Property information sheet

Town/village and address: ................................................................................

Property type and registered description: ................................................................................

Approximate year of construction: ................................................................................

Heated floor area / number of dwellings: ................................................................................

Masonry and known layer build-up: ................................................................................

Roof, floor/ceiling structure and existing insulation: ................................................................................

Window and door types and condition: ................................................................................

Heating and hot-water systems: ................................................................................

Known electrical connection details: ................................................................................

Ventilation and condensation: ................................................................................

Water ingress, moisture and cracks: ................................................................................

Local or heritage protection: ................................................................................

Earlier renovation and funding: ................................................................................

Energy certificate date, identifier and rating: ................................................................................

Proposed work and objective: ................................................................................

Planned timing: ................................................................................

Available documents: ................................................................................

Mark information you do not have as “unknown”. Do not email identity documents, bank statements or ownership documents with your initial enquiry.

4. Cost and financing worksheet

FMDD E-Shield Kft. · Preparation worksheet

Cost and financing worksheet

Property / project: ................................................................................

Quotation date and validity: ................................................................................

Cost categoryGross HUFAccepted / to be clarified / own fundsDue date
Survey, experts and design................................................
Energy documentation................................................
Building fabric work................................................
Building services and controls................................................
Electrical and related work................................................
Reinstatement and related costs................................................
Contingency................................................
TOTAL INVESTMENT................................................

Available own funds: ................................................................................

Planned loan: ................................................................................

Assumed grant, conditions and timing: ................................................................................

Temporary funding requirement: ................................................................................

Other funding: ................................................................................

Unfunded amount: ................................................................................

Total investment = sum of all cost items. Initial funding gap = payments due by the start minus funds actually available by then. If a grant reduces the loan principal, do not count it again as a separate cash receipt.

5. Questions for the energy expert and contractor

FMDD E-Shield Kft. · Preparation worksheet

Questions for the energy expert and contractor

For the energy expert

  • ☐ Which documents and site information are required?
  • ☐ Can the existing certificate be used for the programme?
  • ☐ Which indicator and methodology will be used to calculate the result?
  • ☐ Which package achieves the required result, and under what conditions?
  • ☐ What happens if different materials or equipment are installed?
  • ☐ Which final documents and data must be supplied?

For the contractor

  • ☐ What exact layer build-up, products and quantities does the quotation specify?
  • ☐ What is included in the price, and which related work is charged separately?
  • ☐ Which prerequisites must the client provide?
  • ☐ What are the payment and completion milestones?
  • ☐ How are changes and work that will be concealed documented?
  • ☐ Which handover, warranty and maintenance documents will I receive?
  • ☐ How is any programme-specific contractor status verified?

Answers and open questions: ................................................................................

Responsible person, deadline: ................................................................................

Frequently asked questions

Am I definitely eligible for a grant?

Individual eligibility cannot be determined from this website. It requires examination of the final rules, the property and applicant details, and the lender's assessment.

Should we order a new certificate now?

First have the existing document and the purpose of the assessment checked. Order any new document required for funding once the required content and issue date are known.

Is the renovation passport a mandatory application annex?

We do not make that claim on the basis of the programme announcement reviewed here. The Hungarian passport rules and the specific call must be checked separately.

Can I start work already?

For work intended to be included in the funding, first clarify the rules on starting work, orders, deposits and acceptable invoices. Document urgent building-protection work separately and discuss it with the relevant parties.

Does a 30% result mean an equal reduction in energy bills?

It does not automatically mean the same percentage reduction in bills. Actual costs also depend on use, weather, energy source and prices.

Is every FMDD solution an eligible expense?

Eligibility must be established for each product and type of work under the current programme rules. Privately funded additions should be listed in a separate cost category.

What happens at the first consultation?

We review the property type, renovation goal and existing documents. This establishes the next survey or expert step.

Let's start with the property

Request a preparation consultation!

In your first message, include the town or village, property type, approximate floor area or number of dwellings and your renovation goal. Documents will be requested during the consultation in accordance with the privacy notice.

Request a consultation by email

Varjas Zsolt · +36 20 444 7940
Treutz Zoltán · +36 30 127 3339 · treutz.zoltan@fmdd-eshield.hu

This enquiry is for a preparation consultation; it is not a funding application.

Sources and status of this guide
  1. Wekerle Plusz – official programme information. Announced framework, reviewed: 5 November 2026.
  2. Hungarian building portal – general information on energy certification.
  3. Directive (EU) 2024/1275, particularly Article 12 and Annex VIII. National implementation must be checked separately.
  4. Hungarian Act CXXXIII of 2003 on condominiums. The version in force governs the particular decision.

Unnumbered practical preparation recommendations form part of the editorial guide prepared for FMDD. Programme conditions may change; current official documents govern application preparation.

Get in touch

Let's discuss your building.

Tell us the location and size of your property, its current heating system and your main goal. You can contact either of our team members for an initial discussion.

Costs and expected results can only be estimated from the details of the specific building.